Sorry there hasn’t been any blogs for the last fortnight but it has been manic!
Man Cave 1 had a very short life once the builders arrived on the 25th January
It was completely gone including the rising damp concrete floor by mid afternoon on day 2.
Day 3 saw the footings dug and the cement mixed and in place.
Days 4&5 were the weekend and the builders “don’t do them”!
But of course I do so that was my chance to run a new electric cable in.
Monday to Friday of the second week saw the new insulated and damp proofed floor poured and the walls up to full height.
Today saw the two builders back, the wall plates on and bracketed all the rafters fastened on and the top filling rows of block/bricks on.
Builders due tomorrow to finish off and plasterer booked for Thursday to waterproof render MC 2 inside and out. Weather permitting, needless to say it IS supposed to freeze, which is the worst outlook possible. Fingers crossed though they may be wrong
It will then be down to me to fit the tiles, fit the door and frame, fit the electric, paint MC2 inside and out including the floor, oh yes and fit the work bench shelving and heat.
So everything still on line for Man Cave Magic to hit the ground running from the 6th March